The 2026 Semiconductor Selloff Creates an Opportunity
The Semiconductor Correction of 2026 Launched by the Philadelphia Stock Exchange in December 1993 and now maintained by Nasdaq, the Philadelphia Semiconductor Index (SOX) tracks 30 major U.S.
NAV as of 15 Oct 2026, 12:00 AM UTC
$226.79 (-3.04%)
Year-To-Date Change
337.89%
The Leverage Shares 2x Advanced Micro Devices ETP (ISIN IE00BKT6ZG93) is an exchange traded product (ETP) that seeks to deliver two times (2x) the daily performance of Advanced Micro Devices, Inc. It achieves leverage through margin borrowing and has physical ownership of the underlying, so it does not use swaps or other derivatives to achieve its exposure, and it does not have credit risk. Exposure is rebalanced daily, and an intraday rebalance mechanism ("airbag") is designed to cushion the largest intra-day moves, triggering at 25%. You cannot lose more than the amount you invest. The Leverage Shares 2x Advanced Micro Devices ETP has an annual management fee of 0.75% and is listed on the following exchanges: London Stock Exchange, Euronext Amsterdam. It is designed for short term trading and should be monitored daily.
To seek daily investment results, before fees and expenses, that correspond to 200% (2x) the daily performance of the underlying stock (AMD).
Sophisticated investors and active traders seeking to magnify short-term bullish views or tactically hedge positions, via transparent leverage and without a margin account.
*However, these are complex products.
Value of Underlying Assets
$1,669,823
or 2,970 shares of AMD
AUM
$834,810
or 3,681 shares of AMD2
Liabilities
$835,013
Passported Countries:
* The information on this website regarding UK Fund Reporting Status is accurate as of the stated effective date (the "Effective Date"). Leverage Shares makes no representation or warranty that such information will remain accurate, complete or current thereafter, assumes no obligation to update it, and, to the fullest extent permitted by applicable law, accepts no responsibility or liability for any inaccuracies or omissions arising after the Effective Date.